Written 2026-11-06, before the AXI-link build was metered, and committed before the measurement. Not edited after the data. The AXI-link build (rtl/landscape_axi.v) carries the same engine (rtl/landscape_core.v, rtl version 2) as the EMIO build the class campaign measured (measurements/2026-11-06/PREDICTION.txt). The link is idle while the meter reads: the run state is the engine in repeat mode with no processor access. PREDICTION: t0-recall run minus halt on the AXI build, 3 passes, 60 s settle, 30 samples, equals the EMIO build's t0-recall class result within 2 combined standard errors. If it does not, the power figures quoted for the design are the AXI build's, and the class campaign is repeated on it.