| Filename | Latest commit message | Latest commit date |
|---|---|---|
|
Some checks failed
energy meters on real hardware / RAPL and NVML on jetson-hub (push) Has been cancelled
energy meters on real hardware / sink decode table · RAPL on jetson-hub (NVML surveyed) (push) Has been cancelled
energy meters on real hardware / sink decode table · per-task energy and the GPU rail on macOS (push) Has been cancelled
repository checks / lockfiles, advisories, tests in CI, workflow hygiene, spec and section references, public text (push) Has been cancelled
jouleclaw public surface must stay documented / Public-surface audit (jouleclaw-rs) (push) Has been cancelled
joule-code conformance gate / joule-moq-relay, its own energy on a counter (macos) (push) Successful in 2m15s
wai-app and Create / wai-app · does this change touch it (push) Successful in 1m45s
wai-app and Create / wai-app · tests, clippy, the line language's verifier (linux) (push) Has been cancelled
wai-app and Create / wai-app · Create, browser end-to-end (macos) (push) Has been cancelled
joule-code conformance gate / Build + round-trip C1-C4 vectors (push) Successful in 5m43s
joule-code conformance gate / joule-moq-ingest, every target (push) Has been cancelled
joule-code conformance gate / joule-moq-relay, every target (push) Has been cancelled
The meters count an IOReport interval only within three of the probe's ticks, and the texts that state the rule said nothing of it, so an implementation following any of them would call a lump-refreshed rail live once load stretched its intervals. Each now says what an interval is (from one sample in hand to the next), that only one no longer than three of the probe's ticks (75 ms at its 25 ms tick) counts, that a longer one counts as nothing (not among the intervals, not as an advance, not towards the 300 ms), and that the 300 ms is the summed length of the intervals that count. The normative clauses in arl/ARL-S.md, jcp/SPEC.md, joule-code/spec/receipt.md, joule-ui/SPEC.md, jouleclaw/SPEC.md, JCR-1-spec.md, map/spec/receipt.md, mesh/SPEC.md (a block quote), proof/SPEC.md and sense/SPEC.md; proof-schema's quotation of proof/SPEC.md's; jouleclaw-energy's conformance README; and the proof and sandbox READMEs, which say the cap is IOReport's alone. Map's and Joule Code's unreleased changelog entries, which record the rule as it was added, are amended, since neither release has gone out. No wire or conformance-vector change. Co-Authored-By: Claude Opus 5.5 <[email protected]> |
||
| .. | ||
| src | ||
| Cargo.toml | ||