The rail refused two of the wire's four schemes. Both are implemented.
**`auth-capture`.** Under `escrow` the client's settle places a hold before the
work, and the server finalizes afterwards with a payload it authors itself,
naming the operation as `payload.type`: a capture of what the work cost, or a
void when it cost nothing. `accept` walks that, and refuses a capture over the
hold before it is relayed. Later operations go through the same `/settle`, so
`lifecycle_payload` builds them around the network binding's own fields — the
facilitator is handed the payment rather than left to reconstruct it.
`AuthCapturePayment` is the server's book of one payment: held, captured,
refunded, and the two deadlines. The escrow enforces these on chain, so the
book is not where safety comes from. It is where a doomed operation is refused
*before* it costs a failed settle and, for an asynchronous server, a payment
its own records misdescribe: a capture over the hold or past the capture
deadline, a void with nothing left to release, a refund over what was captured
and not yet refunded or past the refund deadline, a fee outside the bounds the
client authorized. A requirement with no capture deadline is refused rather
than booked — a hold that can never be reclaimed is not one to place.
**`batch-settlement`.** The commitment is verified, the work runs, and the
charge is stored rather than moved, so the result carries an empty
`transaction` and reports the request's price in `extra.chargedAmount`. That is
success, not a missing hash. The charge is bounded where it is reported, since
under this scheme there is no transfer to fail instead.
The settle-time amount rule is now one type, `MeteredCharge`, for every scheme
whose settled figure may differ from the authorized one; `UptoCharge` stays as
its name for the `upto` case.
And the capability document is corrected. It claimed partial settlement as
ground the wire did not cover. The wire's reservation lifecycle is as complete
as ours, and the document now says so and maps all three metered schemes onto
it. What that narrows our contribution there to is exactly two things, stated
without decoration: nothing on that wire bounds the energy the paid work burns,
and none of the three schemes carries a measurement — the figure the buyer pays
is a number the seller produced, bounded above and otherwise unexplained.
Co-Authored-By: Claude <[email protected]>