research: MPEG-AI Part 6 requirement mapping — the one square with a deadline #88
Loading…
Reference in a new issue
No description provided.
Delete branch "wai/mpeg-ai-part6-mapping"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
A preparation document, not a submission and not a normative extension.
The work item
ISO/IEC 23888-6 — Artificial intelligence for multimedia — Part 6: Media authenticity and provenance indication, carried as an ISO PWI. CfP approved by WG 2 at MPEG 155.
Scope: system-level media authentication across the entire lifecycle — authoring, creation, production, editing, storage, delivery, playback. Stage is exploration/requirements: no working draft, no bitstream, no format, no capability string to register. A contribution accepted in January has roughly a year of drafting influence before the text sets.
Why WAI's existing provenance ingest is not coverage
WAI's provenance work is authoring-side manifest provenance — who made an asset and how, bound by hash. This work item is a delivery-and-playback authenticity specification. Treating the former as coverage would be a category error: an authoring manifest says what happened before distribution; this is about what can be asserted and checked during it.
What WAI has that the requirements space does not
Two positions absent from every provenance standard in the survey, both sitting inside a lifecycle-scoped authenticity spec:
Both map to the delivery and playback stages an authoring manifest never reaches.
The asymmetry that makes silence expensive
If this lands as the systems-layer provenance format, WAI is either a profile of it or an alternative to it — and which one is decided by whether the alignment work happened, not by whether a contribution was submitted. Alignment is cheap and reversible. Being an alternative to a ratified systems-layer standard is neither.
§6 states plainly what this does not claim: no contribution will be made, no membership exists, the requirements are not final, and WAI's mechanisms are not adopted by or endorsed by that work item. Submitting requires SC 29 national-body membership — an organisational decision with a lead time against a fixed date.
Ingest queue item 13 (#80 §6.5).
🤖 Generated with Claude Code
0a18e7141d96ca1d0a56